-SULUK AREA-

51°01'00"N  134°13'30"E

Study Phase: prospecting traverses, soil geochem, airborne geophysical survey, geophysics (mag and electric survey, multi-spacing IP profiling). 

Transport accessibility: good accessibility. Close to relief road of Baikal-Amur Mainline. The area has a rugged topography and accessibility.

Nearest Cities: Komsomolsk-on-Amur, Birobidzhan

N-MINING LIMITED participates in the development of the deposit via subsidiary SECOND MINING-EXPLORATION COMPANY LLC

KK8
KK9
KK7
KK12

See also:

© 2020 ALL RIGHTS RESERVED. N-MINING LIMITED